21.04.2010

HMS Group will take part in Uzbek International Exhibition and Conference “Oil and Gas 2010”

HMS Group will take part in the 14th Uzbek International Exhibition and Conference “Oil and Gas” / OGU 2010, which will be held in Tashkent in the National Exhibition Complex “Uzexpotsentr” on May 11-13.

At the stand of the company there will be detailed information on the whole range of equipment of the Group’s companies for the oil-and-gas sector, including

· pumping equipment for crude oil production, refining and transportation:

-       main line pumps of НМ type;

-       charging pumps of NPV and NСN-Е types;

-       pumps for formation-pressure maintenance systems of СNS and EСPK types;

-       progressive cavity pumps for oil production of EVN and VNO types and electric motors to them;

-       multiphase pumps and aggregates;

-       pumps for intrafield transportation of oil;

-       various pumps for technological oil refining and petrochemistry processes;

· pumping equipment for utility systems:

-       pumps for water well of ECV and 2ECV types;

-       pumps for transfer of water and liquids similar to it of D, К, CN and CNs types.

· container packaged equipment for complex development of oil-and-gas fields.

As supplier of complex solutions HMS Group carries out projecting, production, installation supervision and commissioning and start-up of equipment, engineering and turnkey construction of facilities, maintenance service, overhaul and updating of equipment.

HMS Group has a long and successful experience of work on the market of Uzbekistan. It enables the company's specialists to offer and carry out efficient solutions for this region’s Clients on a tight schedule. A permanent representative office of the Group which carries on real-time cooperation with the Client was opened in Tashkent.

Among the Group’s implemented projects in Uzbekistan there are:

· supplies of pump aggregates of HB500-650, TsNS180-1050 and NK types and electric motors to them for the national holding company “Uzbekneftegaz”;

· supplies, assembly and start-up of pumps of AD6300 and AD3200 types and automated controlling system at the pumping stations of the first and second levels of the inlet of the water pipeline “Bozsu” in Tashkent;

· complex supply of equipment for water supply systems of Bukhara and Samarkand;

· engineering and turnkey construction of the pumping station "Shur-kanal", the Marmakhatsky region.

The clients of HMS Group are subdivisions of the national holding company “Uzbekneftegaz”, “Minselvodkhoz” and the trust "Vodokanal” of the Republic of Uzbekistan.

HMS Group's representatives JSC "Gidromashservice" and JSC “Livgidromash” will provide comprehensive information on specifications, operating experience and terms of delivery of the products. The exposition is in Pavilion 1 at Stand A16.


Back to the list

USEFUL LINKS

About company