16.06.2008

HMS Group completed delivery of large equipment lot to OAO Surgutneftegas

OAO Neftemash (Tyumen), forming part of Investment industrial Hydraulic Machines and Systems Group (IIG HMS), completed delivery of three starting gas preparation units (GPU) for OAO Surgutneftegas. The equipment manufactured at OAO Neftemash will be assembled and installed at the oil and gas fields of OAO Surgutneftegas, Ruskinsk and Lyatvorsk (Khanty-Mansiysk autonomous region) until the end of 2008. Total amount by agreements is 21 million roubles. In 2007 OAO Neftemash also delivered two GPUs to OAO Surgutneftegas, which are operated by oil company at Bittemsk and Luckyavinsk fields.


Back to the list

USEFUL LINKS

About company