News


08.04.2010 The certification of the quality management system of HMS Group production facilities has been completed

In March 2010, HMS Group completed the process of certification of the Group production facilities under ISO 9001:2008.


06.04.2010 HMS Group has developed and supplied backup oil pumping stations for the pipeline East Siberia-Pacific Ocean – 1 (ESPO-1)

Enterprises of HMS Group (HYDROMASHSERVICE JSC, Neftemash JSC, NPO Hydromash JSC) together with NG-Energo JSC  (Saint-Petersburg) have successfully implemented the project for installation of backup oil pumping stations with the direct diesel-engine drive at the Oil Pumping Station No14 (the town of Olekminsk) and Oil Pumping Station No17 (the town of Aldan) of phase one of the oil pipeline system ESPO under the order of Transneft JSC.


30.03.2010 HMS Group will take part in Turkmenian exhibition “Water Drop Is a Speck of Gold 2010”

HMS Group will take part in the first International Turkmenian exhibition “Water Drop Is a Speck of Gold 2010”, which will be held in Ashkhabad in the Exhibition palace “Sergi Kosgi” on April 2-4.


18.03.2010 HMS Group will present its integrated approach to fitting of electric power plants with pumping equipment at the exhibition Russia Power-2010

HMS Group will take part in the eighth International Exhibition Russia Power-2010, which will be held at the Central Exhibition Complex Expocentre (Moscow, March 24-26, 2010)


03.12.2009 HMS Group took part in Pure Water Forum

As part of the International Pure Water Forum  held on November 24-25, 2009 in Moscow the Managing director of Institute Rostovsky Vodokanalproekt JSC making part of HMS Group, B.Ye. Breslov made a speech.



206 - 210 of 225
First | Prev. | 40 41 42 43 44 | Next | Last All
USEFUL LINKS

About company