Pumps for Krasnodar combined heat & power station

SE 2500-180-25PE 315-140
PE 65-40-1KsV 320-160-3

    Highlights:
  • Client: E4 Group for Lukoil.
  • Project timing: 2010-2011.
  • HMS Group was selected to engineer, manufacture and supply pumps for a new 410 MW CCGT and successfully met all client’s requirement with custom-made pumping units.
  • EPCM has been carried out by E4 Group for Lukoil-Kubanenergo.
  • A new 410 MW CCGT allows to:
    - increase CHP capacity by 50%;
    - reduce fuel consumption by 25%;
    - ensure high reliability and efficiency without increasing the impact on environment.
Krasnodar CHP with 743 MW capacity is the main power plant in Krasnodar region and supplies energy and heat to Krasnodar city and surrounding areas.
Advantages of our products:
  • PE 315-140 high pressure feed pumps are highly efficient and reliable due to optimized flow parts;
  • VOITH couplings have been supplied for efficient operation under various operating modes;
  • High energy efficiency and low reactive current consumption have been achieved by applying variable speed drives (with frequency converters);
  • All pumps have been made to operate in areas with seismicity up to 8 on a МSК-64 scale.
    Scope of supply
  • PE 315-140 high pressure feed pumps (1-operating, 1 -standby) with VOITH couplings;
  • PE 65-40-1 medium pressure feed pumps (1-operating, 1 -standby) with variable speed drive;
  • KsV-320-160-3 main condensate extraction pumps (3 units);
  • KsV-320-160-3 condensate extraction pumps for heaters (3 units);
  • Ks 80-155-6 condensate extraction pumps for peak boilers (4 units);
  • SE 2500-60-8 circulating pumps for a 1 stage with variable speed drive (3 units);
  • SE 2500-180-25 circulating pumps for a 2 stage with variable speed drive (3 units);
  • D 2500-62-2 cooling water pumps (2 units);
  • Other pumps for auxiliary processes (9 units).