2012

Integrated supply of 48 specially designed oil-trunk pumps for ESPO pipeline system.

Transneft
2010

Main line pumps of Transneft system repair and upgrade: modification of out-of-date equipment, optimization and increasing the pumps performance and durability.

Transneft
2010Primary main-line and charge pumping assemblies (supply) for the Skovorodino-PRC pipeline construction .Transneft
2010

The project is currently underway.
96 pumping assemblies (supply) for Vankorneft ltd manufactured by HMS group member –Nasosenergomash and Livgidromash. Over 20 various standard sizes of pumping assemblies have been designed and installed in the most field processing systems: reservoir pressure maintenance system (primary and charge pumps), in tank farm pumping systems (water, oil); in drainage systems; in the high and low pressure flare separator system; in the heating system and in fire-fighting systems.

Rosneft
2009

Equipment (supply) for the oil port construction in Primorsk (Leningrad Region), oil port in Kozmino (Primorski Krai), oil loading rack in Skovorodino.

Transneft
2009

Pumping equipment (supply) for the Komsomolskiy Refinery construction.

Rosneft
2009

General industrial and CPS pumps (supply) to furnish the Talakan Deposit.

Surgutneftegas
2009

Modular group pumping equipment (supply) to furnish the Kyrtaelskoye and the Yuzhnolyzhskoye Deposits, modular equipment (supply) for Lukoil-Komi ltd.

LUKOIL
2008

Oil & products pipeline construction – “Sever” project: Kstovo (Vtorovo) – Yaroslavl – Kirishi – Primorsk. Main-line pumping assemblies ANM 1250-400 and other pumping equipment (supply).

Transnefteprodukt
2005

Participation in the Baltic Pipeline System (BPS) construction project; the Baltic Pipeline System (BPS-2) expansion in respect of pumping equipment supply.